Monday, April 04, 2011

Revit Design Adventures: Six Sheets in Six Days, Day 2 (19)



Here we are on day 2 (business days, that is). This A2 sheet is showing the existing and demolished plans. As discussed throughout the series, if the Phasing was properly set up and maintained the construction documents were easy to do. Drag and drop the views, easy as that. The view on the left is displaying the Phase as 'Existing' and the Phase Filter as 'Show All'. The plan on the right has the phase set to 'Phase 1'and the Phase Filter is 'Show All'. The next sheet, A3, shows the proposed floor plan and structure.


Previous Post in Series: Revit Design Adventures: Six Sheets in Six Days (18)
Next Post in Series: Revit Design Adventures: Six Sheets in Six Days, Day 3 (20) 